alfanar Power and water Ongoing and Completed Projects list:



Ongoing Projects



SL
#
Ref. No. Project title Client Contract Value (SR) Contract award date End date
1 PE-104 CONSTRUCTION OF ALJOUF 380KV BSP & EXTN. OF HAIL 380KV S/S SEC-EOA 409,924,095 1-Sep-10 30-Jun-14
CONSTRUCTION OF EXTN. OF HAIL 380KV S/S
2 PE-106 CONSTRUCTION OF NEW 132KV S/S -8189 AND INSTALATION OF 132 KV CABLE CIRCUITS- MAUTEN MASHEED 132,000,000 17-Jan-12 30-Apr-14
3 PE-107 CONSTRUCTION OF NEW HARA MAIN HIGH SPEED RAILWAY 380KV SUBSTATIONS SEC-WOA 1,087,673,000 6-Apr-11 28-Dec-13 A
4 PE-112 CONSTRUCTION OF SUBSTATION IN THE UNIVERSITY CAMPUS IN ZULFI M.of high Education 132,000,000 7-Jan-12 5-Jul-14
5 PE-114 Construction Of Yanbu-3 (PS-1) 380/110KV S/S SWCC 716,748,503 9-Dec-12 8-Oct-14
Construction Of PS-2 380/13.8KV S/S
Construction Of MPS 110/13.8KV S/S
6 PE-115 Const. of Umluj North 380kV BSP SEC-COA 409,609,348 26-Sep-12 25-Sep-14
7 PE-116 Con. of 132 KV Cables & OHL JIZAN Uni. SEC-COA 65,300,000 4-Mar-13 4-Sep-14
8 PE-117 JEDDAH CENTRAL 380KV UG CABLES SEC-WOA 259,271,460 3-Mar-13 2-Jan-15
9 PE-118 Makkah Central 380kV Under Ground Cable SEC-WOA 14,289,886 3-Mar-13 2-Sep-14
10 PE-120 110/13.8KV S/S-POWER CABLES ISLAMIC UNIV M.of high Education 166,666,000 -- 12-Nov-15
11 PE-121 REPLACEMENT OF EXISTING 110 KV OHL SEC-WOA 34,635,250 27-Feb-13 3-Sep-14
12 PE-122 380 & 132 KV cable Project In Princess NOURA University SEC-COA 18,937,465 4-Nov-13 30-Jun-14
13 PE-123 132KV EXPANSION OF JAZAN ECONOMIC CITY Cristal 58,288,887 4-Feb-13 4-May-14
14 PE-125 132/13.8 ROYAL GURDS _THOMAM Royal Gards 92,724,094 2-Jun-13 2-Feb-15
15 PE-127 KING FAHD DISTRICT 115/13.8 KV S/S SEC-EOA 259,271,460 6-Aug-15 6-May-15
16 PE-128 WEST of 2nd DIE 115/13.8 KV S/S SEC-EOA 525,841,349 6-Aug-15 6-May-15
17 PE-129 DHAHIYAH 115/13.8 KV S/S SEC-EOA 166,666,000 6-Aug-15 6-May-15
18 PE-130 AL-SHAYYIT 115/13.8 KV S/S SEC-EOA 34,635,250 6-Aug-15 6-May-15
19 PE-131 PP-7 380KV S/S SEC-COA 18,937,465 25-Jul-13 24-May-15
20 PE-132 AL ADEL 380 KV U/G Cables SEC-WOA 58,288,887 25-Aug-13 25-May-15
21 PE-133 Construction of Petro Rabigh 380kV BSP SEC-WOA 287,341,558 6-Mar-14 6-Aug-16
22 PE-134 380KV OHTL FROM RBG IPP2 TO AL-ADEL BSP SEC-WOA 92,724,094 31-Oct-13 31-Oct-15
23 PE-135 RE-INFORCEMENT  AT KUDMI & ABHE SEC-WOA 101,382,404 7-Nov-13 6-Nov-15

Completed Projects



S.No. P.No. Contract No. Client Name project Name Period Value
SAR
1 PE-01 NIL Electricity
Corporation
Farasan Island Electrification Project. Feb'1979 - Feb'1981 6,147,920
2 PE-02 Nil Ministry
of Education
Four  Schools  In Wadi Al-dawasir Apr'1979 - Apr'1981 13,200,000
3 PE-02 NIL National
Guard
Fire Brodge Building in Riyadh & Dammam Jan'1978 - Jan'1979 8,756,680
4 PE-03 NIL Electricity
Corporation
Sajir Electrification Project. Mar'1981 - Apr'1983 40,390.00
5 PE-04 NIL/
Sub contractor
Ministry of
Transportation
Dammam-Dhahran Highway Lighting. June'1981 - Aug'1983 8,740,000
6 PE-05 NIL SCECO-South Al-Aqiq (Al-Baha). Feb'1983 - Feb'1984 7,429,115
7 PE-06 NIL SCECO-West Taif Distribution Network O/H & U/G. Aug'1984 - Aug'1985 Unit Rate Basis
8 PE-07 Sub Contractor SCECO-South Wadi Bin Hashbal Distribution Project. Jan'1984 - Oct'1985 408,000.00
9 PE-08 Sub Contractor SCECO-South Sarat Obeidah Distribution Project. July'1984 - Sept'1985 3,299,000
10 PE-09 C 34/5/C Electricity
Corporation
Supervisory Control And Data Acquisition  (Scada) For Layla Aflaj Oct'1985 - Oct'1989 10,901,121
11 PE-11 Lot-5, Group C Electricity
Corporation
Hail Electrification Project, Lot-5 Dec'1986 - Dec'1989 60,649,000
12 PE-15 Sub Contractor M O A W Al-Aqiq / Al-Baha Water Supply Project. July'1987 - July'1988 3,316,766
13 PM-16 33/1/3/2/C Electricity
Corporation
Tabuk Regional Electrification Project, 132 kV S/S Duba, Bida & Haql. June'1987 - June'1988 2,550,000
14 PM-17 7/12/408 MODA Gas Turbine Project Extension of Air Defense Power House at Jeddah. Sept'1988 - Nov'1989 13,498,294
15 PE-18 3/M/88 MODA Modification   of  Sub-transmission   and  Distribution   of  13.8  kV  Network
A.D.I., Jeddah
Aug'1988 - Aug'1989 33,480,637
16 PE-19 NIL Electricity
Corporation
Hail Water Works Power Supply 13.8 kV Distribution. Apr'1989 - June'1989 1,600,000
17 PM-20 23/10/5 Electricity
Corporation
Construction Of 40 Mw Power Plant In Qurayat July'1990 - July'1992 62,742,271
18 PE-21 Eng/Yan/1037 SCECO-West 110 kV Overhead Transmission Lines, Yanbau Al-Baher. Dec'1990 - Dec'1992 9,616,778
19 PE-22 Eng/Med/1051 SCECO-West Relocation of 110 kV Power & Pilot Cables on 2nd. Ring Road, Madenah. Jan'1991 - Feb'1992 15,807,364
20 PE-23 Eng/Mak/1080 SCECO-West 110 kV Overhead Transmission Lines, Arafat, Makkah Apr'1991 - Apr'1992 7,172,693
21 PE-24 31/MIM/91 MODA Battery 117 Permanent Power Supply, Tabuk. Feb'1992 - Mar'1993 3,442,492
22 PE-25 90PO194 SAMARECo Early Warning For Fuel Leakage At K.K.I.A. - Jeddah Apr'1992 - Feb'1993 1,820,865.00
23 PE-26 Eng/Mak/1091-2 SCECO-West 132 Kv Xlpe Cables For The  Substation At Haram & Misfalah July'1992 - Aug'1994 28,930,103
24 PM-27 NIL Electricity
Corporation
Operation & maintenance of New Qurayat Power Plant. Sept'1992 - Nov'1993 2,623,296
25 PE-29 35-1/1/15 Real Estate
Dev. Fund
132 kV , 13.8 kV S/S Project at Askan Al-Aam Oct'1994 - June'1996 38,225,083
26 PE-30 01/12/2016 SCECO-West Relocation Of Pumping Station- O.H.L Gantry June'1995 - Jan'1996 911,960
27 PE-31 82520/00 SCECO-East Al-Khafji 115/13.8 kV S/S No. 3 and Associated Modifications. Apr'1996 - Apr'1999 25,021,748
28 PE-32 82512/00 SEC EAST Al-Rawdah 115/13.8 kV S/S and Annunciator  Panels in (4) four H.O.A.  at
South Hofuf S/S.
May'1996 - Oct'1998 31,754,297
29 PT-33 47/4/-/1/Ein SEC-CRB Al-Jouf Network Control Upgrade Project (Scada System) May'1997 - Aug'2000 10,748,900
30 PE-34 36/1/16 SEC-WRB Wadi Jaleel 380/110kv Outdoor Substation Project In Makkah Apr'1997 - Oct'1999 124,085,568
31 PE-35 126/1/13 SCECO-West Wadi Jaleel  110 Kv Power & West Pilot Cables  Project In Makkah Apr'1997 - Oct'1999 49,395,650
32 PT-36 98/2/9/1/Ein SEC-CRB Hail Network Control Centre & Associated Systems (Scada System) June'1998 - Nov'2000 29,999,883
33 PT-37 98/2/11/4/Ein SEC-CRB Hail-Qassim Interconnection  & Communication  System. May'1999  - May'2001 24,715,909
34 PC-38 94/1/19 SCECO-West Construction of Mina-2 110/13.8 kV S/S in Makkah (Lot-2: Civil Works) Aug'1999 - Jan'2001 9,239,852
35 PE-39 109/1/19 SCECO-West Construction of Al-Naqa'a 110/13.8 kV S/S in Madinah (Switchgear) Aug'1999 - Mar'2002 29,821,512
36 PE-40 83207/00 SCECO-East Reinforcement  of Dhahran Central 230/69 kV S/S. Nov'1999 - May'2004 33,107,946
37 PE-41 70/1/19 SCECO-West Construction of Mushrefa 110/13.8 kV S/S (Lot-1, Switchgear) Dec'1999 - June'2002 29,991,548
38 PE-42 522/19/3 SEC-CRB Transformer Reinforcement  at 132/33 kV S/S # 8065, 8801 & 8076 Jan'2000 - June'2001 2,910,716
39 PE-43 20/07/2021 National Guardo Permanent Power Supply to Sang 115/13.8 kV SS Al Hassao Sept'2000  - Nov'2002 36,236,620o
40 PE-44 19/1/158 SEC-WRB Upgrade of Overcurrent Relays July'2000 - Jan'2002 3,494,478
41 PE-45 720-8 King Abdul
Aziz University
Power Transformer & Shunt Reactors for KAAU III S/S. Jan'2001  - Feb'2004 11,618,419
42 PE-47 502/22/3 SEC-CRB Reinforcement  of 132 kV S/S # 8070, 8802 & 8803 Jan'2002 - Oct'2003 33,426,591
43 PT-48 517/22/3 SEC-CRB Upgrade  of  Tele-communication  &  Protection  Signal  Equipment  for  the
132 kV Transmission Networks at Al-Qassim.
Apr'2002 - Apr'2004 13,622,877
44 PE-49 83544/00 SEC-ERB Permanent  Replacement  of  Damaged  Transformer  T-603  at  Shedgum
Power Plant.
Apr'2002 - Apr'2004 2,229,740
45 PT-50 91/1/22 SEC-WRB Construction  of 110/13.8KV  S/S at SAFA lot-2,SCADA  & Communication
System
July'2002 - Jan'2004 2,768,506
46 PE-51 537/22/3 SEC-CRB Construction of 132/13.8 kV S/S # 8089 at Al-Mugharazat  Area, Riyadh. Nov'2002 - Feb'2005 35,693,668
47 PE-52 01/02/2023 SEC-WRB Construction  of  Jeddah  North  380/110/13.8  kV S/S  (Switchgear,  Power
Transformer & Civil Works)
May'2003  - May'2005 168,061,392
48 PE-53 72/1/23 SEC-WRB Shifting  of  S/W  Container  at  Kudai  110  kV  S/S  and  Construction  of  a
Retaining Wall.
Nov'2002  - May'2003 1,558,486
49 PE-54 46/2002 SEC-SRB Capacity Reinforcement  of (7) Substations (Al-Baha S/S) Apr'2003  - Aug'2005 26,913,308
50 PE-55  1 061/00           (534/2 2        SEC-CRB Construction Of  New 380kv S/S 9013   (Shifa) Oct'2003 - Aug'2006 204,842,787o
51 PE-56 6600008820
Sub contractor
Al-Osais Co. (ARAMCO) Aramco-subcontract-115kV  OHL  Uthmaniya   GOSP  9,11  &  12  control system Feb'2004   - Aug'2005 1,730,000
52 PE-57 20231001/00 SEC-WOA Replacement of Defective 250MVA Transformer at 380kV KMT S/S Apr'2004 - Mar'2005 10,963,485
53 PE-58 01/0286
Sub-contractor
Al-Osais Co. (ARAMCO) 115kV Overhead Lines Subcontract At Abu Ali Plant Feb'2004   - Aug'2005 127,937
115KV Overhead Lines Subcontract at Juaymah Gas Plant (For Aramco) April 2004 - Dec 2004 575,000
54 PE-59 20431067/00 SEC-WRB Extension Of Jeddah North Substation Feb 2005 - Dec 2006 3,556,700
55 PE-60 10331151/00 SEC-COA Protection Modification of 380/132KV System at Hail Area Feb 2005 -April 2006 14,949,301
56 PE-61 10231010/00 SEC-COA Construction  Of 132 Kv Cable Circuit 8060/9019,  8058/8006  To Connect
Ss # 9013 To The Network
March 2005- May 2007 11,215,732
57 PE-62 30441079/00 SEC-EOA New 33/13.8KV Skaka Industrial SS In Skaka Area Jan 2005- March 2008 19,888,184
58 PE-63 30441103/00 SEC_EOA Reinforcement  Of 1st. Dammam Industrial City 69/13.8 Kv Ss # 2 March 2005- May 2008 12,190,310
59 PE-64 10431153/00 SEC-COA Transformer  Reinforcement  At  132/33  Kv  Ss  #  8812  In  Al-Zulfi  At  Al- Qassim Area Jan 2007- June 2007 13,958,470
60 PE-65 20331001/00o SEC-WOA Reinforcement  of 380/110 kV Jamia S/S 3rd Transformer 380/110 kV:
500MVA
May 2005- May 2007 19,928,890o
61 PE66 30431070/00 SEC-EOA Juaymah Area Reinforcement  (Phase Ii) July 2005- May 2009 82,906,093
62 PE67 27 KFU 69/13.8kV S/Stn # 2 Distribution Feeders to KFU Substation tn# 4 Nov 2005- Nov 2006 32,964,597
63 PE68 20431074/00 SEC-WOA Construction Of The New Al-Sharaieh 110/13.8 Kv S/S Feb 2006- June 2008 48,666,759
20531095/00 SEC-WOA Extension Of Al Sheesha 110-13.8kv Substation Feb 2006- Sep 2008 5,791,407
20531094/00 SEC-WOA Extension Of Jabal Al Noor 110-13.8kv Substation Makkah Feb 2006- May 2008 28,536,418
64 PE69 30531144/00 SEC-EOA Construction of 115/13.8 kV Al-Masoudi S/S Feb 2006- Nov 2008 43,751,854
30131003/00 SEC-EOA Power Supply To Haradh Crude Increment II Feb 2006- July 2008 11,216,090
65 PE70 20531076/00 SEC-WOA Reinforcement  Of Wadi Jalil 380-110-13.8kv  – Makkah Mar 2006- Aug 2008 45,411,241
66 PE71 20531098/00 SEC-WOR Construction of New Al-Misfalah-2 110/13.8 kV S/S Mar 2006- Dec 2008 48,753,814
20531099/00 SEC-WOR Extension Of Al Shafa 110-13.8kv Substation+A1 Mar 2006- Dec 2008 6,187,680
67 PT-72 10531109/00 SEC-COA Enhancement work for Telecommunication Systems Supporting Energy
Transmission Network in sec-coa
Mar 2006- Sep 2008 12,186,732
68 PE-73 20631004/00 SEC-WR Extension of 110KV GIS at Madinah South 380/110KV SS June 2006- March 2008 32,978,194
69 PE-74 30631036/01 SEC-EOA Construction of New Saihat 115/13.8 kV SS Oct 2006- Oct 2008 68,232,425
70 PE-75 30631037/00 SEC-EOA Construction of Al-Ahssa Industrial Estate (HIE) 115/13.8 kV SS # 2 & Modification of 13.8 kV Switchgear @ RWPS 3C SS Nov 2006- Nov 2008 53,213,574
71 PE-76 30631038/00 SEC-EOA Construction of New Al-Qadisiyyah 115/13.8 kV SS Nov 2006- Nov 2008 56,539,510
72 PE-77 30633046/00 SEC-EOA Power Supply to Saudi Aramco East West- Pump Station  3 (SS & OHL) Nov 2006- Oct 2008 89,657,127
73 PE-78 30631040/00 SEC-EOA 115kV OHL for new Saihat S/Stn Nov 2006 - Nov 2008 41,846,030
30631041/00 115kV OHL for Jubail Secondary Industrial S/Stn incl Protection & Communication  Works
74 PE-79 10631061/00 SEC-COA Construction of 132/13.8 kV SS. No. 8139 At King Abdullah Area in Riyadh
City
Nov 2006- July 2009 53,802,652
75 PE-80 10631059/00 SEC-COA Construction of 132/33kV SS. No. 8065 At. Al Thumamah Area in Riyadh
City
Nov 2006- Sep 2009 19,362,641
10631060/00 SEC-COA Reinforcement  Of 132/33 Kv Ss No. 8705 At Al Kharj Area Nov 2006- Sep 2009 19,831,707
76 PE-81 20631040/00 SEC-WOA Reinforcement  of 132 kV OHTL Between Al-Wajh S/S & Al-Ula S/S Dec 2006- Dec 2008 28,327,305
77 PE-82 30631089/00 SEC-EOA 380 kV Substation Works Associated with Generation Expansion Project of PP-8 in Riyadh City (S/S 9021) Dec 2006- Dec 2008 271,818,503
78 PE-83 10621120/00 SEC-COA Const of 1000m3 Deminaralized water tank at Power Plant No.9, Riyadh May 2007- May 2008 1,398,689
79 PE-84 20733005/00 SEC-WOA Construction of New 380/110Kv Thuwal BSP July 2007 - June 2009 236,816,734
80 PE-85 10731045/00 SEC-COA Construction of New 132/13.8KV S/Stn No.8905 at Al-Maseef Area, Hail
City
Feb 2008- Feb 2010 72,894,520
81 PE-86 20731027/00 SEC-COA Construction of 380 K.V S/S -Works Associated with Integration of Phase-
1 of Rabigh (2) Power Plant
Nov 2007 - Oct 2009 505,716,670
82 PE-87 APD39 / SS-8133 SEC-COA Construction of 132/13.8 k.V S/S No. 8133 in alfanar Industrial Area in
Riyadh
July 2009 - July 2011 75,000,000
83 PE-88 40721056/00 SEC-SOA Sharourah Power Plant Extension Portion 1 (GTG 1&2) & Portion 2 (GTG
3)
April 2008- March 2010 358,733,371
84 PE-89 - KFU Construction of the Main Substation of the University Campus in Al-Ahsaa May 2008 - May 2010 104,923,695
85 PE-90 40721056/01 SEC-WOA Constuction of Kandarah 380/110/13.8kV  BSP in Jeddah City June 2008 - Dec 2010 494,729,040
86 PE-92 SEC-WOA Construction of New West Makkah 380/110/13.8kV  Substation Dec 2008- Dec 2010 444,372,399
87 PE94 08-PKI-001 JEC Jazan Economic City 380kV BSP June 2009- June 2011 254,215,939
88 PE95 20731126/00 SEC-WOA Interconnection  of Kandarah BSP with 110kV Jeddah Network Sep 2009- Sep 2010 134,203,242
89 PE96 - National Guard National Guard-King Saud Bin Abdulaziz University for Health Sciences - P I014, Supply & installation of complete transmission s/s (132/13.8kV ) July 2009 - July 2011 109,944,956
90 PE-100 KFU Cable KFU KFU Cable Aug 2010- Aug 2011 78,309,273
91 PE-101 20131128/00 SEC-WOA CONSTRUCTION  OF 380KV WORKS  - RAIBAGH STAGE VII March 2010-Dec 2010 6,750,000
92 PM-103 21021019/00 SEC-COA HAIL-2 POWER PLANT EXTENSION & EXTENSION III April 2011- Dec 2012 1,276,449,506
93 PE-108 31133017 SEC-EOA EXPANSION OF ABU HADRIYA 380KV SUBSTATION Jan 2011- Jan 2012 42,631,947
94 PE-110 21031089/00 SEC-WOA EXPANSION OF 380KV TAIF BSP Jan 2011- Dec 2011 48,879,700
95 PE-111 - SAMSUNG CONSTRUCTION  OF QURAYYAH 380 / 230 KV SUB STATION Nov 2011- Sep 2013 309,375,000